Projects Affecting Traffic for the Week of 7/21/19

city of grand junction public works projects 4

City of Grand Junction Projects with Travel Restrictions

Riverfront Trail Closure – Las Colonias Park

  • Bike / Pedestrian Trail closed from the intersection of 27 ½ Road and C ½ Road to the Old Mill Bridge (Bridge leading to Eagle Rim Park)
  • Bridge access will remain open by way of detour
  • A well-marked detour will be in place
  • Anticipated completion – August.

Street Striping and Pavement Marking Project (Weather Permitting)

  • City crews will be striping the following streets this week:
    • Riverside Parkway from 24 Road to 30 Road
  • Please avoid crossing wet paint
  • Expect short delays.

2019 Asphalt Overlay Projects (Weather Permitting)

  • Guardrail replacement:
    • Redlands Parkway from the Colorado River Bridge to River Road Overpass
  • Anticipated completion – Friday.

7th Street Reconstruction – Orchard Avenue to Patterson Road Project

  • Construction continues along the western half of 7th Street
  • Walnut & Bookcliff Avenues will be closed intermittently west of 7th Street
  • Expect lane shifts, closures and delays
  • All business and resident access will be provided
  • All businesses remain open during construction – don’t forget to support your local businesses!

2019 Street Chip Seal Program

  • The heavily traveled streets affected by this week’s activities include the following:
    • Fog sealing of Ridges Blvd. from School Ridge Road to Hwy 340 on Sunday, July 21
    • Fog sealing of 24 Road from Redlands Parkway Overpass to H Road on Sunday, July 21
    • Fog sealing of D 1/2 Road from D 1/2 Ct. to 30 Road on Monday, July 22
    • Fog sealing of 30 Road from C 1/2 Road to D Road on Monday, July 22
    • Fog sealing of D 1/2 Road from 30 Road to 30 3/4 Road on Tuesday, July 23
    • River Road from Redlands Parkway to Persigo Waste Water Treatment Plant on Wednesday, July 24
  • Intermittent lane closures and traffic delays can be expected.
  • Alternate route advised.

700 Block Main Street – Irrigation Line Repair Project

  • Main Street will be closed to through traffic from 7th Street to 8th Street between the hours of 5am and 11am on Thursday, July 25.

Monument Road Trail Project

  • Monument Road Shoulder work south of S. Redlands Road
  • Intermittent lane closures and traffic delays can be expected
  • A portion of the Lunch Loop/Tabeguach parking lot is closed as well as some of the trails
  • Informational signs will be posted in the parking lot and we apologize for the inconvenience.

8th Street and 9th Street Between Walnut Avenue and Orchard Avenue – Waterline Replacement Project

  • 8th Street and 9th Street are closed to through traffic
  • Access will be provided for local residents
  • Anticipated Completion – Late August

Walnut Avenue between 8th Street and 10th Street – Waterline Replacement Project

  • Walnut Avenue is closed to through traffic
  • Access will be provided for local residents
  • Anticipated Completion – Late August.

Riverside Park Improvement Project

  • Starting Monday, July 22, Riverside Park Drive will be permanently closed between W. Colorado and Hale Avenue
  • A well-marked vehicle and bicycle detour will be in place
  • Anticipated Completion – November.

Non-City of Grand Junction Projects with Travel Restrictions

32 Road Sewer Line Replacement Project – Clifton Sanitation District Project

  • Watch for utility construction (various locations) along 32 Road between I-70B and D Road
  • Please slow down through the work zones and obey traffic control signs and personnel
  • Motorists may experience intermittent lane closures and detours
  • Anticipated completion – September.

Vista Grande Drive (Redlands) Water Line Upgrade – Ute Water Project

  • Vista Grande between E Road and Hwy 340 will be closed to through traffic 8am to 5pm, Monday – Friday
  • Detour route will be in place
  • Access will be provided for local residents
  • Anticipated completion – August.

Orchard Avenue Reconstruction from Normandy Drive to 29 Road – Mesa County Project

  • Orchard Avenue will be closed to through traffic 24/7
  • Detour route will be in place
  • Access will be maintained for local residents at all times
  • Anticipated completion – November.

30 Road from I-70 Business Loop to Patterson Road (F Road) Waterline Replacement Project – Ute Water Project

  • 30 Road will be single lane traffic in each direction through the Work Zone 24/7
  • Delays can be expected
  • Anticipated Completion – December.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s