Projects Affecting Traffic for the Week of 5/27/19

city of grand junction public works projects 4

City of Grand Junction Projects with Travel Restrictions

Annual Street Striping and Pavement Marking Project (Weather Permitting)

  • City crews will be striping the following streets this week:
    • 21 1/2 Road from I Road to Hwy 6 & 50
    • 22 Road from H 1/2 Road to Hwy 6 & 50
    • H Road from 21 1/2 Road to 22 Road
  • Please avoid crossing wet paint
  • Expect short delays.

2019 Asphalt Overlay Projects (Weather Permitting)

This week’s activities will include asphalt paving at the following locations:

  • Redlands Parkway from the Colorado River Bridge to River Road
  • Ramps to River Road will be beginning at Midnight the nights of the 28th and 29th and opening by 6am
  • Mainline paving will occur during normal business hours
  • 27 Road from Crossroads Blvd. to H Road
  • H Road from 26 1/2 Road to 27 1/2 Road

Traffic delays can be expected.

Riverfront Trail Closure – Las Colonias Park

  • Bike / Pedestrian Trail closed from the intersection of 27 ½ Road and C ½ Road to the Old Mill Bridge (Bridge leading to Eagle Rim Park)
  • Bridge access will remain open by way of detour
  • A well-marked detour will be in place
  • Anticipated completion – July.


Non-City of Grand Junction Projects with Travel Restrictions

32 Road Sewer Line Replacement Project – Clifton Sanitation District Project

  • Watch for utility construction (various locations) along 32 Road between I-70B and D Road
  • Please slow down through the work zones and obey traffic control signs and personnel
  • Motorists may experience intermittent lane closures and detours
  • Anticipated completion – September.

Vista Grande Drive (Redlands) between E Road and Highway 340 Water Line Upgrade – Ute Water Project

  • Vista Grande between E Road and Hwy 340 will be closed to through traffic 8am to 5pm, Monday – Friday
  • Detour route will be in place
  • Access will be provided for local residents
  • Anticipated completion – July.

29 ½ Road north of F ½ Road Water Line Replacement – Ute Water Project

  • Expect alternating one-lane traffic and moderate delays
  • Resident access will be maintained at all times
  • Anticipated completion – June.

3rd Street and Colorado Avenue Intersection, Conduit Repair – CenturyLink Project

  • Starting May 28, the intersection of 3rd Street and Colorado Avenue will be closed, if possible there may be limited north-south traffic on 3rd Street through the intersection.
  • Detour route will be in place
  • All business access will remain open
  • Anticipated Completion – Monday.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s